Erlianhot Renewable Power Sugar daddy Micronet Demonstration Project Sunet Right Banner No. 2 Cluster 50MWp Photovoltaic Power Generation Project PC General Contracting Project Notice

作者:

分類:

requestId:68614926c0ac95.02922777.

Tender number: TR.SNTYQ-ELGF-GK001

Tiangong Industrial Network Technology Services (Shenzhen) Co., Ltd. (hereinafter referred to as “Tender Representative Institution”) is under the Pinay Pinay escortQi Tianfeng New Power Co., Ltd. (hereinafter referred to as the “Tenderer”) commissioned a public bid for the PC general contractor of the No. 2 cluster of Suniter Right Banner, Suniter Right Banner.

1. Project Overview and Tendering Scope

1.1 Project Name: Erlianhot Renewable Power Micro-Net Demonstration Project Sunet Right Banner No. 2 Cluster 50MWp Photovoltaic Power Generation Project

1.2 Project Overview: The Erlianhot Renewable Power Micronet Demonstration Project, No. 2, Suniter Right Flag, has a new power total installed capacity of 470MW, including 370MW of wind turbine, 50MW of photovoltaic turbine, and 50MW of light heater. At the same time, the installation equipment is set to 90MW/90MWh. The plan is to build 1 110kV user-change seat, 1 110kV wind stage, 1 110kV wind-change station, and 1 110kV light heat-change seat. A supporting network and energy management system are also built to supply power to the internal power load of the micronet. The first phase of the radio station was built with a 44-stage single-machine capacity of 3.0MW. The wheel height of the fan is 90m and the total machine capacity is 132MW.

1.3 Implementation location: Located in Suniter Right Banner, Xilingol League, Inner Mongolia

1.4 Project construction period:

It is scheduled to enter the venue on July 30, 2020 (specifically subject to the project department’s notification)

50MWp all Sugar baby network: December 10, 2020

2. Tender scope (including but not limited to):

This project has a photovoltaic power supplySugar daddyThe station installation has a capacity of 50MW, and uses a single crystalline silicon 440Wp photovoltaic assembly and a 2.5MW box reverse transformation machine, which is divided into 17 areas. The power generated by the photovoltaic components is reversed through a 35kV box transformer and raised, and then sent to a 110kV wind-transformation station and into the Internet.

2.1 Project construction scope:

This project’s photovoltaicsThe PC package of the station installation project is a 50MW photovoltaic project. The new civil engineering projects include photovoltaic field photovoltaic array installation adjustment, bracket installation, DC cable installation, 35kV electric wire cable installation, DC transfer box, box reverse transformation unit and other installation adjustments, photovoltaic area inspection and repair routes, area area column, area drainage culvert and water and soil Sugar baby maintenance and other related projects.

2.2 Project general purchase scope:

The design and equipment data of the photovoltaic factory area should be brand new, technologically advanced, mature and reliable, so that the photovoltaic field has excellent availability, low factory power consumption, and can meet environmental protection requirements. The systems and equipment used in the photovoltaic field must be mature and have excellent actual consequences. Has the Sugar baby been logically translated? The equipment, design and technical information supplied by the contractor to the contractor must meet the technical specifications and experience requirements.

2.2.1 Photovoltaic components:

This project has a capacity of 50MW for photovoltaic station installations and uses polycrystalline silicon 440Wp photovoltaic components. See the table below for quantity and manufacturer short list, and accessories for component technical specifications.

1.png

2.2.1 box reverse transformation unit (provided by the inverter department):

This project has a capacity of 50MW, and the entire factory photovoltaic component area is divided into 17 3.016MWp square meters. After the battery panel in each unit is transferred through the DC current box, it is connected to two 1260kW inverters. Each square meter has a 2.5MVA double-decision cracking set American box change, and the two low-pressure cracking sets are connected to one inverter. For technical parameters, please refer to the following table and the attachment “Box Reversal One-piece Technical Specifications”

1.png

2.2.1 Other equipment data:

(1) DC current transfer box

(2) Photovoltaic field security system

(3) Photovoltaic area low-pressure ACDC cables and related plugs, coatings, etc.

(4) Photovoltaic area collector line equipment data (including high-pressure cables, tap boxes, etc.)

(5) Lightning protection grounding data in photovoltaic field area

(6) Photovoltaic bracket

(7) Fire-fighting equipment

(8) Other civil construction data

Above equipment data technical specifications, detailed accessories preliminary design, technical specifications, etc.

>2.3 Recruitment of land occupation and continuous management

The following is all the duty-occupation of the 50MW photovoltaic area; the construction party of this section is responsible for the compensation price and continuous management of the permanent and temporarily occupied land in the photovoltaic area

1.png

2.4 Construction of construction facilities:

The bidder must set up an independent area that meets all members’ offices; the bidder will find a fair area nearby to build and related ancillary facilities for career construction and related ancillary facilities (the price of temporary leases that occur is borne by the bidder), and sufficient fire-fighting equipment should be installed and paid attention to fire protection forests. Water and electricity should be rented by themselves in the surrounding villages. href=”https://philippines-sugar.net/”>Sugar daddy, based on the actual situation on the scene, choose fair construction electricity, be responsible for the electric power operation and bear the construction electricity price;. The environmental protection and security within the region are responsible for the bidder and serve the bidder project department and supervisor. The project construction process must strictly implement the various requests and regulations in the soil and water maintenance and environmental protection plan of this project.

2.5 Project-related processing scope:

2.5.1 Land acquisition: land acquisition and occupation: land acquisition and occupation surface measurement, authority registration, tabulation, approval by the government, payment of all land distribution funds, forest land, grassland, green seedlings and impedances, and process coordination; including application All related repairs related to clearing of obstacles, seedlings, forests, etc. within the construction scope are carried out continuously, forest land and grassland are handled continuously, and the reform, expropriation and demolition of agricultural network facilities, water conservancy facilities, and communication facilities are carried out independently by the bidder;

2.5.2 Fire protection inspections are completed (including design preparation cases, inspection acceptance cases, engineering acceptance, etc.), and all prices that occur as a result are counted into the total contract price;

2.5.3 Complete construction inspection drawings and continuous processing; complete professional health care three, safety facilities three, domestic and local management three, three certificates, environmental protection, Water maintenance construction, preparations and acceptance; temporary facilities are restored to meet the acceptance of environmental water maintenance; all prices that arise from this are counted in the contract;

2.5.4 The lightning protection grounding system responsible for construction projects is checked in the contract through relevant local authorities, and all prices that arise from this are counted in the contract;

2.5.5 Complete the ability supervision project, quality inspection site preparation data set and specific manual handling; complete all experience and collection organizations of quality supervision stations before and after the network and obtain experience and collection results; complete the purchase and sale contract, site adjustment naming, and network adjustment Confirmation and high-voltage supply and use electric plan are carried out online in advance; complete related tasks such as network company experience and collection, including: completing network security performance evaluation and obtaining security review reports, completing secondary security plan editing commission, network security risk assessment, and information System-level protection evaluation and supporting tasks, meet the requests of local network companies, complete the communication and automatic adjustment coordination before reversing the signal and signal-controlled communication before reversing the signal-based communication, remote point-based communication, automatic adjustment, and follow-up protection fixed value calculation and preparation, as well as all network company request data sets The volume and manual processing TC: